Rockwell Automation EK-29000-DPH01 Dual Probe Holder User Manual

Page 11

Advertising
background image

Dual Probe Holder 11

Publication GMSI10-UM028A-EN-E - November 2007

5. Pull stinger out from base.

6. Unscrew probe and remove.

To install probe

1. Clean the threads of the stinger.

2. Install the appropriate sensor o-ring onto the base of the threaded portion of the

probe. Use Table 2 on page 7 to determine which o-ring to install.

3. Apply two drops of thread locking compound, such as Loctite 242 (or greater), to the

probe threads.

4. Insert probe cable into the stinger and tighten probe to 66 in-lb (7.5 N-m).

5. Apply a film of grease to the unthreaded surface of the stinger. Insert the stinger into

the base until the knurled adjusting knob contacts the base.

6. Install the adjusting cage and hand tighten.

7. Install the jam nut so the flat portion of the stinger is above the jam nut.

8. Connect the non-contact sensor to the monitoring system.

9. Gap the probe. Refer to the eddy current probe manual for probe gap procedures and

specifications.

10. Tighten jam nut and verify gap voltage. Use a wrench on flat portion of the stinger to

ensure the stinger does not move while tightening the jam nut. Tighten the jam nut to
35 ft-lb (48 N-m) torque.

TIP

To prevent the non-contact sensor from contacting the target
surface, it is advisable to rotate the knurled adjusting knob until it
bottoms out of threads.

ATTENTION

Do not scratch sensor tip or target surface.

Advertising