Figure 3 – Rockwell Automation EK-29000-DPH01 Dual Probe Holder User Manual

Page 8

Advertising
background image

8 Dual Probe Holder

Publication GMSI10-UM028A-EN-E - November 2007

Figure 3 Placement of O-Rings

Install Base on Machine

4. Install the appropriate base o-ring into the grove in the Dual Probe Holder base. See

Figure 3. Use Table 2 on page 7 to determine which o-ring to install.

5. Apply anti-seize compound to the threaded portion of the Dual Probe Holder base

and install the base into the machine casing. Tighten to 55 ft-lb (75 N-m) torque.

Install Reverse Mount Probe Stinger

6. Install the appropriate sensor o-ring onto the base of the threaded portion of the

probe. Use Table 2 on page 7 to determine which o-ring to install.

7. Apply two drops of thread adhesive, such as Blue Loctite 242 (or greater), to the

probe threads.

8. Insert probe cable into the stinger and tighten probe to 66 in-lb (7.5 N-m).

Advertising