Replacing the conductor, Storage and shipment, Storing the load resistor – Bird Technologies SCC8 Series-Manual User Manual

Page 39: Shipping the load resistor

Advertising
background image

Maintenance

25

Replacing the Conductor

1. Remove the cap screws [16] from the RF connector, using a

3

16

allen wrench.

2. Remove the outer conductor assembly [12].



Note:

If only the outer conductor needs replaced, install it now and

screw it into place.

3. Remove the center conductor assembly [11] by pulling it carefully out of

the load housing.



Note:

Make sure the resistor [1] and inner flow tube [9] do not

come out with the center conductor.

4. Insert the new center conductor assembly into load housing.



Note:

Make sure the resistor fitting makes a snug fit with the resistor.

5. Replace the outer conductor and screw it into place.

Storage and Shipment

Storing the Load Resistor

1. Cover Bird HPCC Loads before storing to keep out dust and dirt.
2. It is not necessary to install the shipping plug.
3. Store in a dry, dust-free environment where the ambient temperature will

remain between –40 and +45 °C (–40 to +113 °F).

Shipping the Load Resistor

1. Remove the vent plug.
2. Install the shipping plug.
3. Wrap the vent plug with padding and tape it to the side of the load for pro-

tection.



Note:

With the shipping plug installed, it is not necessary to empty

out the coolant.

4. Wrap the connector in padding.
5. Pack and brace the load in a sturdy wooden crate for shipment.

Advertising