5 start-up – Metrohm 920 Absorber Module User Manual

Page 87

Advertising
background image

■■■■■■■■■■■■■■■■■■■■■■

5 Start-up

920 Absorber Module

■■■■■■■■

79

5 Start-up

All of the Combustion IC system components have to be completely
installed before putting the 920 Absorber Module into operation; this
means:

■

The Combustion Module including ABD and optional sampler (MMS
5000) and, if necessary, the LPG/GSS Module is installed according to
the specifications in the Combustion IC operating instructions from
Analytik Jena.

■

The 920 Absorber Module is installed according to the specifications in
the manual for the 920 Absorber Module and is connected to the
Combustion Module.

■

The 930 Compact IC Flex (2.930.2560) is installed according to the
specifications in the manual for the ion chromatograph and is connec-
ted to the 920 Absorber Module.

■

The ion chromatograph is connected to a computer where the
MagIC Net software is installed.

Putting the Combustion IC system into operation

1 Starting the software

■

Switch on the PC and start the software MagIC Net.

■

Enter user name and password.

The software starts and shows the Workplace program part.

2 Switching on the instruments

■

Switch on the Combustion Module: the Combustion Oven and
the ABD, the MMS 5000 sampler or the LPG/GSS Module, if it is
present.

■

Switch on the Combustion IC system.

■

Switch on the ion chromatograph.
MagIC Net detects all of the instruments and asks if they are to be
saved to the device table.

■

Confirm all of the prompts with [Yes].

Advertising