INSTALLATION

A-02950

Secondary

Gas

Plasma (+)

Gas

Remote Hand

Pendant Control

Cable

Coolant

Return

Coolant

Supply (-)

Control Cable

Connector

Figure 3-15 Unshielded Machine Torch Connections

5. Connect torch coolant and gas leads to connectors on

the Torch Bulkhead Panel.

6. Close the Access Panel and turn the two latching

screws.

7. Check the torch for proper parts assembly.

C. Machine Systems (Shielded Leads)

Systems ordered with Shielded Machine Torch will in-
clude a Computer Control (CNC) Control Cable. The
CNC Control Cable allows the Power Supply to interface
with a computer or other control device.

NOTE

Refer to Appendix 5 for CNC Control Cable Inter-
face Signal Diagram.

Connect the CNC Control Cable and Torch Leads to the
Power Supply as follows:

1. Open the Access Panel to gain access to the Torch

Bulkhead Panel.

2. Remove the hardware attached to the power sup-

ply end of the leads assembly with a tie wrap.

3. Feed the connector on the end of the CNC Control

Cable through the rubber boot on the front panel of
the Power Supply (see NOTE).

NOTE

Feed the Control Cable through the rubber boot first
as there will not be enough space inside the rubber
boot for the connector if the Coolant and Gas Leads
have been fed through the rubber boot first.

4. Connect the CNC Control Cable connector to the

Control Cable connector on the Torch Bulkhead
Panel.

5. Feed the end of the Torch Leads through the rubber

boot.

6. Refer to the illustration. The Leads Assembly in-

cludes two leads shields; each shield includes two
ring-tongue connectors. Connect the Torch Leads
Shield Wires as follows:

a. Remove one nut and star washer from the torch

leads shield stud on the Torch Bulkhead Panel.

b. Place the ring lugs from the inner (RED) Torch

Leads Shield Wires over the shield stud on the
Torch Bulkhead Panel.

c. Secure the wires with the nut and star washer.

d. Place the ring lugs from the outer (GREEN /

YELLOW) Torch Leads Shield Wires over the
shield stud on the power supply chassis.

e. Use the nut and star washer previously re-

moved from the torch leads assembly to secure
the wires to the shield stud on the power sup-
ply chassis.

Secondary

Gas

Plasma (+)

Gas

Control Cable

Connector

Coolant

Supply (-)

CNC Control

Cable

RED Shield Wires

With Ring Lugs

Torch Leads

Shield Stud

(for INNER Shields)

GREEN / YELLOW Shield

Wires with Ring Lugs

Torch Leads

Shield Stud

(for OUTER Shields)

Coolant

Return

Art # A-03997

Power
Supply
Chassis

Torch
Bulkhead
Panel

Figure 3-16 Shielded Machine Torch Connections

Advertising