07 oxygen plasma pre-charge unit operational check, 07 pre-charge unit checks, No change switch to o2 position – Tweco XTTM-300 User Manual

Page 24: Underside of pre-charge unit, Plasma gas selection o, Shield

Advertising
background image

INSTALLATION

3-12

Manual 0-2912

INCLUDES

AUTO GAS BOX VERSION

PLASMA

SHIELD

N2

AUX

A

AUX

B

B

O

2

No

Change Switch

to O2 position.

PLASMA GAS SELECTION

AIR

O

2

H35&N

2

ALL MANUAL GAS BOXES

AUTO GAS BOX VERSION

INCLUDES

A

PLASMA GAS SELECTION

AIR

O

2

H35&N

2

PLASMA

SHIELD

N2

AUX

A

AUX

B

O

2

Version A

Version B

Compare to Gas Control Console Switches

In Version A installations:

Is the Plasma Gas Selector switch

in the O2 position?

In Version B installations:

Is the Plasma Gas Selector switch

in the O2 position?

Yes

Yes

Art # A-06409

PLASMA GAS SELECTOR

AIR

O

2

H35&N

2

ALL MANUAL GAS BOXES

AUTO GAS BOX VERSION

INCLUDES

INCLUDES

AUTO GAS BOX VERSION

PLASMA

SHIELD

N2

AUX

A

AUX

B

A

B

O

2

Underside of Pre-Charge Unit

PLASMA GAS SELECTOR

AIR

O

2

H35&N

2

ALL MANUAL GAS BOXES

AUTO GAS BOX VERSION

INCLUDES

INCLUDES

AUTO GAS BOX VERSION

PLASMA

SHIELD

N2

AUX

A

AUX

B

A

B

O

2

Underside of Pre-Charge Unit

Check underside of Plasma Pre-Charge Unit

Check underside of Plasma Pre-Charge Unit

PLASMA

SHIELD

O

2

AUX

A

AUX

B

N2

TEST

TEST

RUN

PREFLOW

(4, 5)

CUTFLOW

(1, 2, 3)

HD3070 5-KNOB AUTO BOX SWITCH SETTINGS

PLASMA GAS SELECTION

O

2

H35 & N2

TEST

TEST

RUN

PREFLOW

CUTFLOW

HD3070 6-KNOB AUTO BOX SWITCH SETTINGS

AIR

Green Light

No

Is the Pre-Charge Unit switch

in the B position?

Change Switch
to B position.

Yes

No

Is the Pre-Charge Unit switch

in the A position?

Change Switch

to A position.

Yes

Is the green

light ON?

Green Light

PLASMA

(AUX A)

(AUX B)

O

2

N

2

SHIELD

HD3070 3-KNOB MANUAL BOX

No

Change Switch

to O2 position.

Is the green

light ON?

All switches are

set properly.

Yes

All switches are

set properly.

Yes

3.07 Oxygen Plasma Pre-Charge Unit Operational Check

THE PRE-CHARGE UNIT INCLUDES A GREEN LIGHT TO INDICATE THAT THE SYSTEM IS PRE-CHARGING
THE TORCH LEADS WITH OXYGEN. Follow the steps shown to confirm that switches on the gas console and on
the pre-charge unit are set properly. DO NOT OPERATE the system unless all gas control switches are set properly.

Advertising