Cutmaster 40mm – Tweco 40mm Cutmaster User Manual
Page 26
CUTMASTER 40mm
INSTALLATION 3-4
Manual 0-5084
Using High Pressure Air Cylinders
When using high pressure air cylinders as the air
supply:
1. Refer to the manufacturer’s specifications
for installation and maintenance proce-
dures for high pressure regulators.
2. Examine the cylinder valves to be sure
they are clean and free of oil, grease or any
foreign material. Briefly open each cylin-
der valve to blow out any dust which may
be present.
3. The cylinder must be equipped with an
adjustable high - pressure regulator capable
of outlet pressures up to 100 psi (6.9 bar)
maximum and flows of at least 300 scfh
(141.5 lpm).
4. Connect supply hose to the cylinder.
NOTE
Pressure should be set at 100 psi (6.9 bar) at the
high pressure cylinder regulator.
Supply hose must be at least 1/4 inch (6 mm)
I.D.
For a secure seal, apply thread sealant to the
fitting threads, according to manufacturer's
instructions. Do Not use Teflon tape as a thread
sealer, as small particles of the tape may break
off and block the small air passages in the torch.