15 height control connections, 16 gas control module installation, Height control connections -16 – Tweco 400 Ultra-Cut(October 2014) User Manual

Page 42: Gas control module installation -16

Advertising
background image

ULTRA-CUT 100 XT/200 XT/300 XT/400 XT

3-16

INSTALLATION

Manual 0-5264

3.15 Height Control Connections

The terminal strip provides connections to negative Arc Volts (Torch or electrode), Tip Volts (Pilot) and Work.

These are for a height control that requires connection to the full non-divided arc voltage. Also available on the

terminal strip are 120VAC and 24 VAC. The allowable current draw is 100ma @ 120VAC and 1Amp @ 24 VAC.

Art # A-11900

24 VAC

@ 1A

TB4

1

2

3

4

5

6

7

120 VAC

@ 100 ma.

Work

Tip Volts

(Pilot)

Arc Volts

(Torch)

Art # A-11954

NOTE

There are holes added in the rear panel for customer wiring. This, rather than the one in the CCM will be

the preferred place for customer added wiring (and strain relief) for connections to height controls, etc..

3.16 Gas Control Module Installation

The Gas Control Module must be installed in a suitable location where it is easily accessible to the system operator.

The unit must be mounted to a flat horizontal surface. If the Module is mounted to a gantry or to any other support

subject to vibration or motion, the installer must fasten the module to the support securely.

The Module should be located as far away as possible from the Arc Starter due to electromagnetic interference. It

is acceptable to locate the control cable in the same track as the cables from the Arc Starter.

The Module includes feet which lift the bottom panel off the mounting surface. There are ventilation holes on the

bottom panel; the space between the bottom panel and the mounting surface must remain open for ventilating air

to enter the module. Louvers on the back panel of the module must also remain unblocked, for the free passage

of ventilating air.

Advertising
This manual is related to the following products: