Ultra-cut 300 xt – Tweco 300 XT Ultra-Cut Plasma Cutting System User Manual

Page 42

Advertising
background image

ULTRA-CUT 300 XT

3-18

INSTALLATION

Manual 0-5274

NOTE

The unit must be mounted so that the Flowmeters are plumb. If the Flowmeters are not plumb, incorrect flow

indications may occur.

Preparation

1. Remove the screws securing the Cover Panel to the Module.

2. Carefully remove the cover from the module noting the attached ground wire. Remove the ground wire if

needed.

Art # A-06882

Gas Control Module Cover

Do not remove

Remove Ground
Wire

Cover Removal

Advertising