3.03.01 Electrical Input Requirements

Operate the welding power source from a single/three-phase 50/60 Hz, AC power supply. The
input voltage must match one of the electrical input voltages shown on the input data label on
the unit nameplate. Contact the local electric utility for information about the type of electrical
service available, how proper connections should be made, and inspection required.

The line disconnect switch provides a safe and convenient means to completely remove all
electrical power from the welding power supply whenever necessary to inspect or service the
unit.

Note 2

This unit is equipped with a three-conductor with earth power cable that is connected at the
welding power source end for single and three phase electrical input power.

Do not connect an input (BROWN or BLUE or RED) conductor to the ground terminal.

Do not connect the ground (YELLOW/GREEN) conductor to an input line terminal.

Refer to Figure 3:

1. Connect end of ground (YELLOW/GREEN) conductor to a suitable ground. Use a grounding

method that complies with all applicable electrical codes.

2. Connect ends of line 1 (BROWN) and line 2 (BLUE) and line 3 (RED) input conductors to a

de-energized line disconnect switch.

3. Use Table 1 and Table 2 as a guide to select line fuses for the disconnect switch.

Input Voltage

Fuse Size

400 VAC

30 Amps

Table 1 - Electrical Input Connections

NOTE: Fuse size is based on not more than 200 percent of the rated input amperage of
the welding power source (Based on Article 630, National Electrical Code).

Figure 3. Electrical Input Connections