Tweco Eliminator Spool Gun User Manual

Page 21

Advertising
background image

safety and operating instructions

7-17

89200011

Pre-Welding Procedure

SECTION 7:

PRE-WELDING PROCEDURE

1. Make sure all connections have been made.
2. Turn the power source “on”.
3. Adjust the flow of the shielding gas to the desired level.

NOTE

The gun trigger on the spool gun assembly will have to be depressed to allow

gas flow.

4. If using the ESG-1 control box, adjust the run-in speed of the filler metal to the desired

value by means of the run-in speed control located on the front panel of the ESG-1.

5. Adjust the wire speed of the filler metal to the desired value by means of the wire feed

speed control located in the handle of the spool gun assembly.

6. Adjust the voltage of the power source to the desired value by means of the voltage control

located on the power source.

Advertising