INSTALLATION Of BUSHINGS

CARBON GRAPHITE

The canister bushing requires a special fixture for proper

assembly. It is only sold as an assembly with the canister.

If attempting to install the carbon graphite idler or casing

bushing, extreme care must be taken to prevent breaking.

Carbon graphite is a brittle material and easily cracked.

If cracked, the bushing will quickly disintegrate. Using a

lubricant on the bushing and mating part will help facilitate

installation.

Figure 16 shows the proper position of the casing bushing

after installation. This will require a special fixture for proper

position. Improper location may result in a pump with

excessive slip or requiring a large number of shims. The

additional precautions listed below must be followed for

installation:
1. An arbor press must be used for installation.
2. Be certain the bushing is started straight.
3. Do not stop the pressing operation until the bushing is in

the proper position; starting and stopping will result in a

cracked bushing.

4. After installation, check the bushing for cracks.

DISASSEMBLY / ASSEMBLY Of

BEARING CARRIER HOUSING

DISASSEMBLY

The bearing carrier housing features two sealed ball bearings

along with an outer magnet assembly. If further disassembly

of this unit is required, proceed as follows:

1. Remove the internal retaining ring. Then press the shaft

out of the housing.

2. Remove the external retaining rings from shaft, place

unit into press and push out shaft out of the bearings.

ASSEMBLY

1. Place some Loctite on the O.D. of the first bearing and

press into the housing bore. Position the bearing spacer

in the bore and insert the second bearing. Center the

bearing spacer then press in shaft with one external

retaining ring on shaft. Press down until ring contacts

bearing race then install second ring Install internal

retaining ring into bearing housing.

2. Slide outer magnet assembly onto pump shaft. Locate

the outer magnet per dimension “A” then tighten the two

setscrews.

Coupling Series

“A” Dim.

A Series

165 mm

B Series

198 mm

fIGURE 15

OUTER MAGNET, BOLT ON HUB

AND BEARING HOUSING

Bearing

Housing

Ball Bearings

External

Retaining Rings

Spacer

Internal

Retaining Ring

Set Screw

Outer Magnet

fIGURE 16

CASING BUSHING POSITIONING

ASSEMBLY Of PUMP

Use a suitable lubricant compatible with the fluid being

handled when reassembling the pump.

Inspect all parts, especially drilled holes in the casing (for

draining) to make sure they are not plugged. Replace any

worn parts, remove any burrs, and clean all parts before

assembling the pump.

1. If the canister O-ring needs to be replaced, apply a

lubricant to the O-ring and place it into the O-ring groove.

If the O-ring is PTFE (derivative) encapsulated, follow

these special instructions.