Lift cables (111’), Assembly (figure 3.34) – Wheatheart Swing Away Flex Auger User Manual

Page 51

Advertising
background image

W

HEATHEART

- SA F

LEX

A

UGER

3. A

SSEMBLY

71’ - 111’

3.11. L

IFT

C

ABLES

(111’)

30651 R5

51

Figure 3.34

13. Fasten flat braces (B)

to first set of holes
(furthest from intake)
on stabilizer braces (A)
with one 5/8” x 2" bolt
and locknut. Place one
5/8” x 1-1/8” bolt and
locknut in other hole of
stabilizer brace.

14. Attach upper lift arms to

center hole on the lift-
assist arms (Figure
3.35) with two 15/16”
medium spacers, flat
washers, and two 1" x
3-1/2” bolts and
locknuts. Tighten securely; lift arms will pivot on the spacer bushings.

15. Lower discharge end of auger slowly until track shoe rests against trackstop

and the lift-assist arm rests against track.

3.11. LIFT CABLES (111’)

1. Seat lift-assist arm against the track and place both lift cylinders in full down

position (fully retracted).

Important:

Lift cables may stretch with use. Check frequently and adjust when necessary.

2. Thread the lift cables over the respective pulleys on the lift-assist arm, pull

cables tight, and secure with three 3/8” cable clamps on each cable. Tighten
securely.
Do not crisscross cables (Figure 3.36).

Figure 3.35

Advertising