Transport undercarriage – Wheatheart WHR 130 x 51-71ft Augers PTO User Manual

Page 26

Advertising
background image

3. A

SSEMBLY

WHEATHEART - GHR & WHR GRAIN AUGERS

3.9. T

RANSPORT

U

NDERCARRIAGE

GRAIN AUGERS SD

26

30662 R1

3.9. TRANSPORT UNDERCARRIAGE

See Figure 3.12.

1. Fasten the lower reach arms to the axle with three 5/8” x 2" bolts and

locknuts on each side.

2. Attach long tubular crossmember to bottom of large frame brackets with

5/8” x 1-1/2” bolts and locknuts (Figure 3.12).

3. Attach short channel crossmember loosely to small frame brackets with two

5/8” x 2" bolts and locknuts, sandwiching the flat braces (B) between short
crossmember and small frame brackets on each side. Leave this way until
you raise the discharge end.

4. For 61’ and 71’ augers only: Secure the tubing crossbraces to the welded

lugs on the lower reach arms with four 1/2” x 1-1/4” bolts and locknuts, and a
fifth one where the braces cross. Tighten securely.

Figure 3.12

5. Wheel hub assembly:

a. Remove any dirt or paint

from spindle and hub.

b. Thoroughly pack wheel

bearings and cups with a
good grade of bearing
grease.

c. Place large bearing into

hub and carefully tap in
seal.

d. Slip hub onto spindle

and insert small bearing.

Figure 3.13

Advertising
This manual is related to the following products: