Transport & placement, Transport procedure – Wheatheart WHR 130 x 51-71ft Augers PTO User Manual

Page 35

Advertising
background image

WHEATHEART - GHR & WHR GRAIN AUGERS

4. T

RANSPORT

& P

LACEMENT

GRAIN AUGERS SD

4.1. T

RANSPORT

P

ROCEDURE

30662 R1

35

4. Transport & Placement

4.1. TRANSPORT PROCEDURE

Follow all safety precautions when transporting the auger and use a proper
towing vehicle.

1. If auger is raised, place in full down position. The roller track shoe should be

seated against the upper track stop with slight tension on the lift cable. Refer
to “Lowering & Completion” on page 42.

2. Place and secure hitch pin and safety chain. The safety chain should be

threaded through handle on the lower tube and wrapped around auger tube
before attaching to the towing vehicle.

Important:

Use a type of hitch pin (see Figure 4.1) that will not allow auger to separate from
towing vehicle.

3. Disconnect PTO driveline from tractor and secure in transport saddle.

Figure 4.1

4. Beware of overhead obstructions and electrical wires and devices. The PTO-

SD augers have minimum clearances of 13’0” to 15’6” (3.96 m to 4.72 m) in
normal transport position.

Warning: Before continuing, ensure you have read and understand the relevant information
in the safety section. Safety information is provided to help prevent serious injury, death, or
property damage.

Advertising
This manual is related to the following products: