5. Operation

5.1. PRE-OPERATIONAL CHECKLIST

Before operating auger each time, the operator must confirm the following:

• All fasteners are secure as per assembly instructions.
• PTO driveline is connected and secure.
• PTO driveline shield rotates freely.
• Lift cable is not frayed or damaged.
• Lift cable is properly seated in cable sheaves.
• Cable clamps are secure.
• Tube alignment is reasonably straight.
• Auger wheels are chocked, and if necessary, tractor wheels are chocked

or the parking brake has been engaged.

• Intake area and discharge spout are free of obstructions.
• Proper maintenance has been performed.

5.2. AUGER DRIVE & LOCKOUT PROCEDURE

Warning: Before continuing, ensure you have read and understand the relevant information
in the safety section. Safety information is provided to help prevent serious injury, death, or
property damage.

Drive

Type

Before Operation

Lockout

PTO
Driveline

Before starting, ensure:

• PTO driveline is securely attached to

the tractor and gearbox

• tractor park brake in engaged and/or

wheels are chocked

• you are not exceeding the maximum

operating length of 92” (2337 mm) of the
PTO driveline or maximum angle of 15°

• PTO drive on the tractor is in the off

position

Shut off tractor’s engine and
remove key from tractor.

• If removing key is impossible,

remove PTO driveline from trac-
tor.