Shutdown, Notice – Wheatheart R Series Augers User Manual

Page 26

Advertising
background image

5. O

PERATION

W

HEATHEART

- R S

ERIES

A

UGERS

5.4. O

PERATING

P

ROCEDURES

R8-36, R8-41, R8-46, R8-51, R10-36, R10-41, & R10-51

26

30758 R1

R

ESTARTING

WITH

A

F

ULL

T

UBE

The tube may be filled with material if the machine is shut down inadvertently or

for an emergency. It is recommended that you restart with the following

procedure:
1. With the power source locked out, remove as much of the grain as possible

from the tube and intake.

2. Start the engine and run it at half speed. Slowly engage the belt until the

auger is brought up to speed.

3. Once the auger has been started, increase the engine speed to achieve the

desired augering speed.

5.4.3. S

HUTDOWN

N

ORMAL

S

HUTDOWN

1. Near the end of the load, reduce the feed of grain and decrease the auger

speed (if possible).

2. Run the auger until the tube is empty.
3. When auger is clear of grain, disengage the belt, and stop engine/motor, or

disengage the PTO.

4. Shut down, and lock out power source.

E

MERGENCY

S

TOP

Although it is recommended that the machine be emptied before stopping, in an

emergency situation:
1. Stop or shut down the power source immediately.
2. Stop the flow of material (if applicable).

3. Lock out power, and correct the emergency before resuming work.

NOTICE

Always engage belts with engine idling. Engaging belts at

high engine speed will result in premature belt wear

NOTICE

Prolonged operation of an empty auger will cause

unnecessary wear.

Advertising