Fertilizer drill hoses, Install chain guard, Step 52 – Great Plains 1005NT Assembly Instructions User Manual

Page 15

Advertising
background image

Great Plains Manufacturing, Inc.

Installation Instructions

13

06/02/2008

123-535M

Fertilizer Drill Hoses

Refer to Figure 13
52. If fertilizer delivery hoses

were disconnected, re-

connected them now. As needed, one or two hoses
may be routed through the jackshaft bracket.

Install Chain Guard

Refer to Figure 14
53. Select one each new:

123-424D EWNT SGS FORMED SHIELD
800-120C NUT CLIP U-TYPE 5/16-18
803-008C NUT HEX 5/16-18 PLT

two sets new:

802-159C HHCS 5/16-18X1 GR5
804-009C WASHER LOCK SPRING 5/16 PLT

and three new:

804-036C WASHER FLAT 5/16 SAE PLT

54. Place the U-clip nut

over the hole at the top rear

of the inside plate of the jackshaft bracket

. Ori-

ent the integrated nut to the right of the bracket.

55. Place a flat washer

on a bolt

and insert it,

from inside the Small Seeds box

, through the ver-

tical slotted hole on the left end wall. Loosely secure
the top end of the guard

with another flat

washer

, lock washer

and nut

.

56. Place a lock washer

and flat washer

on a

bolt

and insert it, from drill left, through the

lower horizontal slot on the guard

. Loosely

secure with the U-clip nut

.

57. Snug the guard forward against the main seed box

and torque both bolts to specification.

Figure 13

Re-Route Fertilizer Hose

10916

1

1

Figure 14

Chain Guard

28010

198

2

186

193

189

195

189

195

191

193

195

185

U

D

L

R

B

F

185

186

191

189

193

195

186

198

195

189

2

185

195

193

191

193

195

189

185

186

Advertising