Completing setup, Reel shipping blocks, Spring pre-load – Great Plains 2551SC Predelivery Manual User Manual

Page 15: Reel shipping blocks spring pre-load

Advertising
background image

Great Plains Manufacturing, Inc.

Table of Contents

Index

Assembly

11

10/10/2013

Table of Contents

Index

540-179Q

Completing Setup

Reel Shipping Blocks

Refer to Figure 12
32. All seedbed conditioner baskets will be shipped with

shipping block with decal. Loosen spring and get pres-
sure off block, remove and discard blocks.

Spring Pre-Load

Refer to Figure 13
33. Now set the spring pre-load on all the seedbed condi-

tioner baskets to 8 3/8” from top of the spring to the top
of the cupped spring washer. Nuts should bottom out at
the end of the threads.

Note: Double check that all bolts are tightened to specs,

See “Torque Values Chart” on page 12. Check that
safety decals are readable and not covered up. Check
that safety lights are visible with machine folded for
transport.

34. Once baskets springs are pre-loaded and all of the

hydraulic procedures have been completed, fold the
machine to check for clearance and hose routing.
Slowly fold the machine while watching that hoses do
not become pinched or kinked.

35. Once the machine is folded completely, begin to unfold

slowly. Prior to transporting, fully raise and fold seed-
bed conditioner. Install the transport locks and wing
stop pins. Always use the transport locks and pins
when moving from field to field in case of a hydraulic
hose failure.

36. At this point, setup of the machine is complete, be sure

to consult the “Operator’s Manual”, for the first time
field adjustments before going to the field.

Figure 12

Reel Shipping Block

41398

Figure 13

Spring Pre-Load

40846

Advertising