Center transport, Trusses & level bar, Center transport trusses & level bar – Great Plains 1500TM Assembly Manual User Manual

Page 13

Advertising
background image

Great Plains Manufacturing, Inc.

Assembly

9

12/12/2013

586-535Q-ENG

Center Transport

Refer to Figure 6

12. Slide hub/spindle assemblies

into torque tube

and

align holes. Secure with 5/16 x 3 1/2, Gr. 8 hex bolts
and 5/16 top lock nut.

13. Attach tire/wheel assembly

with 5/8 lug nuts

.

14. Tighten all bolts with lock nuts snug, but do not torque.

The rest of the bolts may be tightened to specs, See
Torque Values Chart” on page 24.

Trusses & Level Bar

Refer to Figure 7
15. Attach hitch trusses

with 3/4 x 2 hex bolt

(front

& rear plates), 3/4 x 2 1/2 hex bolt

(middle plates),

3/4 lock washers and 3/4 nuts.

16. Install level bar

to torque tube with 1 x 9 1/2 pins

, 3/8 x 2 1/4, Gr. 8 hex bolts

and 3/8 nylon lock

nut.

17. Install h-bracket assembly

to front of level bar

with 3/4 x 2, Gr. 8 hex bolts

, 3/4 lock washers and

3/4 nuts.

18. Install bottom of h-bracket assembly

to front of

center frame with 1 x 3 1/4 clevis pin

, 1.5 x 1.00

x.075 machine washer

and 3/16 x 2 cotter pin.

19. Tighten all bolts with lock nuts snug, but do not

torque. The rest of the bolts may be tightened to
specs, See “Torque Values Chart” on page 24.

1

U

D

F

B

L

R

4

Figure 6

Center Transport

42981

3

5

2

4

1

2

3

4

5

1

2

3

4

5

6

7

4

8

7

9

10

U

D

F

B

L

R

5

1

7

4

9

6

2

10

Figure 7

Trusses & Level Bar

42982

1

3

8

2

Advertising
This manual is related to the following products: