Center Gang Bar

Note: Refer to center gang bar assembly in “Parts Man-

ual” for correct part numbers of all components.

Refer to machine layout drawings in this manual
for correct gang assembly placement.

Refer to Figure 13
44. Position gang assemblies

in proper locations.

Install the gang pivot bolt

through tubes of gang

bars and tubes on center frame, secure with 1 1/4
flat washers

(one on top and one on bottom), 1 1/

4 slotted nut

(one on top and one on bottom).

Tighten bolts snug, torque to 350 to 400ft-lbs. Install
the 3/16 x 2 cotter pins

through 1 1/4 slotted nuts

and bend over to secure.

Note: Be sure turnbuckle assembly

is preset at 30 1/

4” before installing as shown below. See gang
angle adjustment in “Operator Manual” before
going to field.

45. Install rocker arm

to tube on center frame with 1 1/

4 x 10 special thread bolt

, secure with 1 1/4 top

lock nut.

46. Install link

with 1 x 3 1/4 clevis pin

, 1.5 x 1.00 x

0.075 machine washer

and 3/16 x 2 cotter pin

.

47. Install turnbuckle assembly

, adjustable end on ear

on front of rear gang bars and fixed end on rear of
rocker arm

. Secure with 1 x 3 1/4 clevis pin

, 1.5

x 1.00 x 0.075 machine washer

and 3/16 x 2 cot-

ter pin

.

48. Install the round tubes

(two on each gang bar)

between bottom front plate

(slotted hole toward

rear), rear plates

and plates on center frame.

Install the 3/4 x 6 hex bolts

, 3/4 lock washers and

3/4 nuts. Attach other ends of plates

and

to

bottom of center frame with 3/4 x 2 hex bolts

and

3/4 lock washers.

49. Install bracket

on bottom side of gang bar plate,

secure with 5/8 x 3 1/2 hex bolts

, 5/8 lock wash-

ers and 5/8 nuts.

50. Now the gang cylinders

may be hooked up with

the 1 x 3 1/8 clevis pin

, 1.5 x 1.00 x 0.075

machine washer

and 3/16 x 2 cotter pin

.

51. Install other end of gauge link

to ear on front of

the left, front gang tube, secure with 3/8 x 1 1/4 hex
bolt

, 3/8 top lock nut

.

52. Hook gang cylinder hoses to gang cylinders, be sure

all fittings are tightened to specs, See “Hydraulic
Connector ID
” on page 25. No
w the gang system
may be purged of air, See “Gang Cylinder Purging
on page 18.

53. Bolts may be tightened to specs, See “Torque Val-

ues Chart” on page 24 and all cotter pins may be
bent.

1

2

3

4

5

4

9

6

7

8

10

11

5

9

6

10

11

5

14

12

13

15

12

13

22

16

17

18

19

11

5

20

21

22

Advertising
This manual is related to the following products: