Purging lift system – Great Plains 1500TM Assembly Manual User Manual

Page 17

Advertising
background image

Great Plains Manufacturing, Inc.

Assembly

13

12/12/2013

586-535Q-ENG

Purging Lift System

Note: When lift hoses are routed and hooked up to cylinders

and valves the systems will need purged of air. Purging
the lift system now will allow the machine to be raised
up or down for ease of gang assembly installation.

Refer to Figure 12

42. Charge the lift system first. Extend the lift cylinders

(black handles) until the center section is fully raised.
Remove the 3/8 x 3 transport lock pins

from transport

locks

and store on lift straps

. Raise and lower the lift

system several times to purge air from system. Watch for
leaks and retighten fittings if necessary.

43. The gang angle system may not be purged until after

hoses and valves are hooked up when gang assemblies
and cylinders are installed, See “Gang Cylinder Purg-
ing
” on page 18 f
or purging gang system.

2

U

D

F

B

L

R

3

Figure 12

Purging Lift System

42981

3

1

1

3

4

1

2

3

4

Advertising
This manual is related to the following products: