Distribution towers and hoses – Great Plains ADI334 Predelivery Manual User Manual

Page 16

Advertising
background image

14

Section 2 Setup

Models ADI334 and ADI345 Air Drill Implement 160-243M

4/7/04

Great Plains Mfg., Inc.

Distribution Towers and Hoses

1.

Refer to Figure 2-13 for tower mounting locations.
Mount towers so there is no interference when wings
are folded or unfolded.

2.

Refer to Figure 2-11. Install a tower support bracket at
each location using the 1/2-inch u-bolts (1), lock
washers (2) and nuts (3).

3.

Refer to Figure 2-12. Position a tower on bracket so
the lower round plate is about 31 1/2-inches above the
frame rails. Turn tower so that inlet tube is pointed to-
ward the center of the drill. Secure tower with two u-
bolts.

14546

Figure 2-11

Mounting Tower Brackets

IMPORTANT: Mount towers as vertically as possible.
Installing towers so that they lean to one side may
cause uneven distribution, especially on hillsides.

4.

When towers have been installed, fold implement very
slowly while watching to be sure there is no interfer-
ence. If towers have any interference, unfold wing then
move towers until they clear.

Figure 2-12

Inlet Tube Alignment

14499

Advertising
This manual is related to the following products: