20 meter 20 bout tramlining sequence – Great Plains V-300F Operator Manual User Manual

Page 68

Advertising
background image

64

V300 & V300F

Great Plains Manufacturing, Inc.

148-057M-A

11/15/2007

20 Meter 20 Bout Tramlining Sequence

For use with a 3 meter drill and a 20 meter sprayer. 2 + 2
left-hand seed spouts are closed on bouts 4 and 17,
Asymmetric right-hand seed spouts closed on bouts 10
and 11. Starting on bout 1 requires turning LEFT at the
end of the first bout.

The instrument beeps once at the beginning of a tramline
bout (#4, #10, #11 and #17 in this case), and the display
continues flashing for the duration of the bout.

This sequence requires an optional 3rd tramline clutch.

22602

Tramline Bouts

20m Sprayer

3m Drill

20 Bouts

Advertising