Mounting coulter gangframe – Great Plains Max Cover Verti-Till Ripper Operator Manual User Manual

Page 19

Advertising
background image

8/6/07

596-098M

17

Preparation and Setup

Mounting Coulter Gangframe

Refer to Figure 5

1.

Slide the coulter gangframe (1) under the
front end of the Verti-Till Ripper. Make sure
the coulters angle towards the back of the rip-
per.

2.

Position the coulter gangframe (1) so the four
lifting brackets are directly below the four
brackets on the front and rear coulter gang-
frame rockshaft.

3.

Using the hydraulics of the implement, raise
or lower the coulter and/or transport cylin-
ders. Align the holes in the coulter frame with
the coulter lift arms.

4.

Insert pins (2) aligning holes in the ends of the
pins with the holes in the brackets. Secure
pins with 3/8” x 2 1/2” bolts and 3/8” lock nuts.

Figure 5

Mounting Coulter Gangframe

21581

Advertising