Installing shins and tips – Great Plains Max Cover Verti-Till Ripper Operator Manual User Manual
Page 24
Advertising
5, 7, & 9 Shank
596-098M
8/6/07
22
Installing Shins and Tips
No-Till Shanks
Refer to Figure 10
1.
Attach the no-till shin retainer (1) to the no-till
shank using 1/2” x 1 3/4” bolts, 1/2” lock
washers and 1/2” nuts.
2.
Remove the 1/2” x 1 3/4” roll pin (2) and save
for later use.
3.
Slide one end of the no-till shin (3) under the
no-till shin retainer (1). Hold the lower end in
place by installing a no-till tip (4). Secure the
no-till tip in place with the roll pin (2) removed
in step 2.
4.
Insert larger roll pin (5) through second hole
in the no-till tip (4) to help secure tip.
Figure 10
No-Till Shins and Tips
21655
Advertising