Final wheel hub install, Mount wheels, Igure 28 – Great Plains Gauge Wheel-Spindle User Manual
Page 17
Great Plains Mfg., Inc.
Installation Instructions
17
04/10/2009
195-080M
Final Wheel Hub Install
Refer to Figure 28
79. With correct sprocket clearances achieved, place a
hub
on the threaded end of the spindle.
80. Select one new or saved washer and nut:
804-182C WASHER HARD 1 1/2 MILCARB GR8
803-239C NUT HEX SLOTTED 1 1/2-12 PLT
Place the washer
on the threaded end of the
spindle, and add nut
. Tighten nut until
hub
is seated far enough to allow insertion of
hub cross-bolt.
81. Secure hub cross-bolts with washers
flanged lock nuts
. Tighten lock nuts until a gap
of
1
⁄
32
in (0.8mm) remains between nut
washer
and hub casting.
82. Continue tightening castellated nut
until there
is no side-to-side play in the spindle assembly. If
there is still play with the nut fully seated, remove
the hub and add a 2in washer
threaded end of the spindle.
IMPORTANT !
Do not overtighten castellated nut, or bearings will
be damaged.
83. Rotate the spindle and check for sprocket and hub
clearance inside the gauge wheel weldment.
84. Select one new:
805-148C PIN COTTER 3/8 X 3 PLT
Secure castellated nut
Mount Wheels
Refer to Figure 29
85. Select two new or saved wheel sets:
,
,
or
and if new wheels, two new decals:
818-751C DECAL CAUTION TIRE 32 PSI
or
838-092C DECAL CAUTION TIRE 60PSI/85FT
Clean and dry the wheel rim near the valve stem.
Apply the decals. Smooth out any air bubbles.
86. Select twelve (12) new or saved wheel bolts:
802-104C BOLT WHEEL 1/2-20X1 90-DEG
Mount the wheels with the valve stem side facing
away from the ground drive weldment. Torque to
specified value on decal. See torque chart on
page 19 for metric values.
Figure 28
Final Wheel Hub Install
29446
Figure 29
Wheel Mounting
29446