Pre-assembly preparation, Tools required – Great Plains Gauge Wheel-Spindle User Manual

Page 3

Advertising
background image

Great Plains Mfg., Inc.

Installation Instructions

3

04/10/2009

195-080M

Pre-Assembly Preparation

Tools Required

• updated drill Parts Manual (see page 1)

• suitable tractor for positioning, unfolding and lowering

drill

• blocks for securing transport tires if drill will be

unhitched for the work

• a jack or stand for elevating one gauge wheel weld-

ment at a time

• bearing seal removal and seating tools; if specialized

tools are not available, substitute two lengths of thick
(e.g. Schedule 40) plastic pipe with outside diameters:
A. inside seal: 3 to 3

3

8

in (7.62 to 8.57cm), and

B. outside seal: 3

1

2

to 3

7

8

in (8.89 to 9.84cm)

C. bearing cup: 3

1

2

to 3

3

4

in (8.89 to 9.52cm)

A length of about 1ft (30cm) suffices. A cap on one
end would provide a tapping surface for a mallet.

For seating the shallow inside seal, use a flat metal
plate, about

3

4

in x 4in and 12in long (2x5x30cm).

• a length of steel or iron pipe, 1

3

8

in (3.5cm) I.D. or

larger, and a length of 3 to 5 feet (just over a meter)

• de-greasing fluids,

anti-seize compound, and
bearing grease

• basic hand tools, including:

2

1

4

in (5.8cm) hex socket

5

16

in (7.5 to 7.9mm) punch

Advertising