Re-install walkboards, Re-install smv reflector, Re-install walkboards re-install smv reflector – Great Plains 3S-5000HD Assembly Instructions User Manual

Page 34

Advertising
background image

30

3S-5000/F/HD/HDF SGS

Table of Contents

Index

Great Plains Manufacturing, Inc.

133-415M

Table of Contents

Index

2013-07-30

Re-Install Walkboards

Start with the LH side of the left wing.

Refer to Figure 47 (depicting the right wing, LH side)

129. Select the removed walkboard

that is marked for

the current section and side. Use the lift or hoist to
align it with the extensions (

or

).

Note: Align the walkboard with the outside end of the

section, as the part mating is more obvious there.

130. Select four (4) sets saved or new:

803-020C NUT HEX 1/2-13 PLT

804-015C WASHER LOCK SPRING 1/2 PLT

802-034C HHCS 1/2-13X1 1/4 GR5

Insert the bolts

from the left, through both

aligned parts. Secure with lock washers

, and

nuts

.

Repeat step 129 and step 130 for each section side.

Fold down ladders when all walkboards are installed.

Re-Install SMV Reflector

Refer to Figure 48

131. Select one saved:

818-055C DECAL SLOW MOVING-GALV. BACKED

and two sets saved or new:

802-004C HHCS 1/4-20X3/4 GR5

804-006C WASHER LOCK SPRING 1/4 PLT

803-006C NUT HEX 1/4-20 PLT

Position the SMV

on the center small seed box

mount weldment

of the center section. Secure

with bolts

, lock washers

and nuts

.

21

25

U

D

B

F

R

L

17

17

25

21

6

181

Figure 47:

Re-Install Walkboard

34601

6

181

182

21

25

17

21

25

17

Figure 48:

SMV Placard Mount

34600

U

D

F

B

L

R

136

20

24

30

16

30

16

24

20

30

136

16

24

20

Advertising
This manual is related to the following products: