Assembly, Install center brace bar & torque tube – Great Plains DVN8324 Assembly Manual User Manual

Page 11

Advertising
background image

11/25/2013

550-466Q-ENG

Great Plains Manufacturing, Inc.

7

Assembly

Refer to Figure 5

Install Center Brace Bar & Torque Tube

1.

Once the center Frame has been uncrated and put
on stands, the torque tube maybe installed.

2.

Carefully raise the torque tube

with an overhead

hoist and secure with 1 1/4 x 6 pins

, 3/8 x 2 1/4 Gr.

8 hex bolts and 3/8 top lock nut.

3.

Install pre-assembled hub assembly or brake hub
assembly (if machine is equipped with brakes)

,

using the 1 x 4 5/8 pin

and secure with 3/8 x 2 roll

pin.

4.

Attach the tire/wheel assembly

to hub assembly 3)

and secure with 5/8 lug nuts

.

5.

Now install 3.50 x 8 x 1.25 cylinders

using 1 x 3 1/

8 pins

, 1.5 x 1.0 x.075 machine washers and 3/16

x 2 cotter pins.

• Install cylinder transport locks

to cylinders

using

the 3/8 x 3 pins and clip pin.

6.

Carefully move center brace bar

into position with

fork truck or overhead hoist. Secure with 3/4 x 2 hex
bolts

, 3/4 lock washers and 3/4 hex nuts.

7.

All bolts may be tightened to specs, See “Torque
Values Chart
” on page 37. Attach plastic end caps

to all open ends of 4 x 3 tube.

1

2

3

4

5

6

7

8

9

7

10

11

12

Figure 5

Center Brace Bar & Torque Tube

41544

U

D

F

B

L

R

7

10

8

9

4

2

3

6

5

1

4

3

8

8

9

11

12

12

11

Advertising
This manual is related to the following products: