Flush-mount installation, Mounting rail (see figure 2-4), Ws (see figure 2-4) – Dell POWEREDGE 1950 User Manual

Page 35

Advertising
background image

Two-Post Rack Installation

33

Figure 2-4.

Installing the Mounting Rails for Center-Mount Configuration

Flush-Mount Installation

The two-post rack kit is shipped with the brackets configured for a 7.62-cm (3-inch) wide center-mount
installation. See Figure 2-1 for mounting rail components. To prepare the mounting rails for flush-mount
installation in the two-post rack, perform the following steps:

1 Locate the two mounting rails and place them side by side on a smooth work surface, with the front

ends of the mounting rails toward you (see Figure 2-5).

2 Using a 3/8-inch wrench or nut driver, remove two nuts from the adjustable mounting bracket

(see Figure 2-5).

1

two-post open-frame rack

2

12-24 x 0.5-inch pan-head
Phillips screws (4 per rail)

3

center-mount mounting flange

2

mounting rails (2)

4

system rails (2)

6

release latch

2

1

4

6

3

5

Advertising