Powering on the library – Dell PowerVault ML6000 User Manual

Page 19

Advertising
background image

Dell PowerVault ML6000 Getting Started Guide

19

Powering On the Library

1 Turn on each power supply’s power switch.
2 Turn on the library’s main power using the power button located on the

front of the 5U Library Control Module.

The Setup Wizard screen appears on the operator panel when the library
has completed its power-on self-test (POST) and initialization. This
process takes approximately 30 minutes. Do not power off the library
during this process.

1

Module terminator

2

Ethernet cable connected to Gigabit
Ethernet port

3

Module-to-module cable

4

Power cords

DAO.book Page 19 Tuesday, March 9, 2010 4:58 PM

Advertising