Installing the rack-to-tower kit – Dell PowerEdge 2800 User Manual

Page 20

Advertising
background image

18

Tower-to-Rack and Rack-to-Tower Conversion Guide

www

.dell.com | support.dell.com

Figure 1-9.

Installing the Rack Bezel

Installing the Rack Doors

See the documentation provided with the rack for instructions on installing rack doors.

Installing the Rack-to-Tower Kit

CAUTION:

The system may weigh up to 45.36 kilograms (100 pounds) when fully loaded. To prevent

personal injury, do not attempt to move the system by yourself.

Rack-to-Tower Kit Contents

The rack-to-tower kit includes the following items (see Figure 1-10):

One tower bezel complete with keylock and keys

One tower front panel

bezel

keylock

release latch

Y1001bk0.book Page 18 Thursday, July 8, 2004 4:32 PM

Advertising