Installing the rack-to-tower kit – Dell PowerEdge 2800 User Manual
Page 20
Advertising
18
Tower-to-Rack and Rack-to-Tower Conversion Guide
www
.dell.com | support.dell.com
Figure 1-9.
Installing the Rack Bezel
Installing the Rack Doors
See the documentation provided with the rack for instructions on installing rack doors.
Installing the Rack-to-Tower Kit
CAUTION:
The system may weigh up to 45.36 kilograms (100 pounds) when fully loaded. To prevent
personal injury, do not attempt to move the system by yourself.
Rack-to-Tower Kit Contents
The rack-to-tower kit includes the following items (see Figure 1-10):
•
One tower bezel complete with keylock and keys
•
One tower front panel
bezel
keylock
release latch
Y1001bk0.book Page 18 Thursday, July 8, 2004 4:32 PM
Advertising