Important, Leave, Installation – Qmark Ceiling Fan Accessories User Manual

Page 2

Advertising
background image

1. Place three guard bottom sections on flat surface

(floor) and connect together in

3

/

4

circle using

enclosed 1

1

/

8

” bolts, washers, lockwashers and

5

/

16

nuts.

(See Figure 3)

Installation

3. With three sections assembled, place

1

/

2

of guard

clamp brace on top section and bolt to top of guard.

(See Figure 5)

Figure 3 - Assemble Bottom Section

Figure 5 - Assemble Clamp Brace

2. Place each of three guard top sections on top of

matching bottom and bolt together using 1

1

/

8

” and

1

1

/

2

” bolts, washers, lockwashers and

5

/

16

” nuts. (At

this time do not bolt the 2 top bolts closest to the
center of the fan guard.)

(See Figure 4)

Figure 4 - Assemble Top Section

Figure 6 - Install Guard to Fan

4. Insert completely assembled fan with blades

attached into guard and attach steel brace to fan
downrod, leaving

1

/

2

” between top of canopy and

guard and at least 2” from bottow of motor. Attach
second half of guard clamp to the fan downrod.

(See Figure 6)

LEAVE

1

/

2

” OF SPACE BETWEEN TOP OF

CANOPY AND GUARD AND AT LEAST 2”
FROM BOTTOM OF MOTOR. MAKE SURE
ALL HARDWARE IS SECURE TO PREVENT
GUARD/CANOPY FROM TOUCHING.

IMPORTANT!

2

Advertising