BULK CURRENT INJECTION PROBES

Insertion Loss

© ETS-Lindgren, L.P. – February 2005

11

Rev C – PN 399263

PROCEDURE

1. Connect the signal generator output directly to the RF

voltmeter input as show in Figure 3, indicated by the dashed

line, using the same cables which connected the calibration jig

and the injection probe under test. Tune to the test frequency

and adjust the signal level for a reference of 0 dBm indication

on the RF voltmeter.

2. Without changing control settings, connect the signal generator

output to the bulk current injection probe input and connect the

calibration jig connector to the RF voltmeter input.

3. Note the RF voltmeter output in dB. The difference between

this reading and 0 dB is the insertion loss. In this

measurement, the loss can not be less than 3 dB since half the

injected power is absorbed by the 50 Ohm termination that is

particularly loading (50%) the Calibration Jig.

Figure 3—Typical Reference Calibration Setup

50

Termination

Probe

Calibration Jig

Signal

Generator

50

RF

Voltmeter

50

Archived 6/1/10

Advertising