START--UP CHECKLIST

(Remove and Store in Job Files)

I. PRELIMINARY INFORMATION
MODEL NO.:
SERIAL NO.:
DATE:
TECHNICIAN:

II. PRESTART--UP (Insert check mark in box as each item is completed)
( ) VERIFY THAT ALL PACKING MATERIALS HAVE BEEN REMOVED FROM UNIT
( ) REMOVE ALL SHIPPING HOLD DOWN BOLTS AND BRACKETS PER INSTALLATION INSTRUCTIONS
( ) CHECK ALL ELECTRICAL CONNECTIONS AND TERMINALS FOR TIGHTNESS
( ) CHECK THAT INDOOR (EVAPORATOR) AIR FILTER IS CLEAN AND IN PLACE
( ) VERIFY THAT UNIT INSTALLATION IS LEVEL
( ) CHECK FAN WHEEL, AND PROPELLER FOR LOCATION IN HOUSING/ORIFICE AND SETSCREW TIGHTNESS

III. START--UP
ELECTRICAL
SUPPLY VOLTAGE
COMPRESSOR AMPS
INDOOR (EVAPORATOR) FAN AMPS
TEMPERATURES
OUTDOOR (CONDENSER) AIR TEMPERATURE

DB

RETURN--AIR TEMPERATURE

DB

WB

COOLING SUPPLY AIR

DB

WB

PRESSURES
REFRIGERANT SUCTION

PSIG, SUCTION LINE TEMP*

REFRIGERANT DISCHARGE

PSIG, LIQUID TEMP{

( ) VERIFY REFRIGERANT CHARGE USING CHARGING CHARTS

* Measured at suction inlet to compressor
{

Measured at liquid line leaving condenser.

Copyright 2011 Carrier Corp. S 7310 W. Morris St. S Indianapolis, IN 46231

Edition Date: 01/11

Manufacturer reserves the right to change, at any time, specifications and designs without notice and without obligations.

Catalog No:50VL---08SI

Replaces: 50VL--- 07SI