Wilbur Curtis GEM-120A User Manual

Service manual – gem-120a satellite brewer

Advertising
background image

C

Service Manual – GEM-120A Satellite Brewer

W

ilbur

C

urtis

C

ompany

, i

nC

.

ISO 9001:2008 REGISTERED

WILBUR CURTIS CO., INC.

6913 West Acco Street

Montebello, CA 90640-5403

For the latest information go to

www.wilburcurtis.com

Tel: 800-421-6150

Fax: 323-837-2410

3. Connect the unit to electrical outlet with appropriate amperage rating (see serial tag on machine).
4. Once power has been supplied to the unit, flip the toggle switch to the ‘ON’ position (located on the rear of the unit), the

water tank will begin to fill. When the water level in the tank reaches the probe, the heating element(s) will turn on.

5. Water in the heating tank will require approximately a half hour before reaching operating temperature (factory setting

of 200°F). When the water temperature in the heating tank is ready, the green "BREW WHEN LIT" light will come on.

NSF International requires the following water connection:

1. A quick disconnect or additional coiled tubing (at least 2x the depth of the unit) is required so that the unit

can be moved for cleaning.

2. This unit must be installed with adequate backflow protection to comply with applicable federal, state and

local codes.

3. Water pipe connections and fixtures directly connected to a portable water supply shall be sized, installed

and maintained in accordance with federal, state, and local codes.

Symbols:

WARNINGS – To help avoid personal injury

Important Notes/Cautions – from the factory

Sanitation Requirements

This equipment is designed for commercial use. Any servicing other than cleaning and routine maintenance should be

performed by an authorized Wilbur Curtis Company Service Technician.
• DO NOT immerse the unit in water or any other liquid
• To reduce the risk of fire or electric shock, DO NOT open service panels. There are no user serviceable parts

inside.
• Keep hands and other items away from hot areas of the unit during operation.
• Never clean with scouring powders or harsh chemicals.

INSTALLATION

This Curtis unit is pre-set and ready to go from the factory.
Factory settings for this unit are:

• Brew Temperature = 200°F

• Brew Volume = Set to vessel requirements (1 Gallon).

System Requirements:

• Water Supply 20 – 90 PSI (minimum flow rate of 1 gpm)
• Electrical: See electrical schematic.

Important Safeguards/Symbols

For the latest specifications and information go to www.wilburcurtis.com

NOTE: A water filtration system must be used to help maintain trouble-free operation. In areas with extremely hard

water, we highly recommend the use of a Curtis approved water filter. For our full line of filters, please log on to

www.wilburcurtis.com. A water filtration system will greatly prolong the life of the unit and enhance the quality and

taste of the product.

SETUP STEPS

1. The unit should be level (left to right - front to back), on a secure surface.
2. Connect the water line to the water inlet fitting on the rear of the unit. Water volume flow to the machine should be

consistent. Use tubing sized sufficiently to provide a minimum flow rate of one gallon per minute.

Model:

● GEM-120A

CAUTION: DO NOT

connect the unit to

hot water supply.

The inlet valve is not rated for

hot water.

CAUTION: Follow

this setup procedure

before attempting

to use this unit. Failure to

follow these instructions can

result in injury and/or void of
warranty.

CAUTION:

Equipment must be

installed to comply

with applicable federal, state,

and local plumbing/electrical

codes.

Advertising