Wilbur Curtis ALPHA 6GTN Fresh-Trac User Manual

Service manual – alpgt fresh-trac

Advertising
background image

1

Models Included:

• ALPHA 3GT Fresh-Trac

• ALPHA 6GTN Fresh-Trac

Technical Support: 1-800-995-0417 M-F 5:30am-4:00pm PT

Email: [email protected]

3. Connect the unit to electrical outlet with appropriate amperage rating (see serial tag on machine).
4. Once power has been supplied to the unit, flip the toggle switch to the ‘ON’ position (located on the rear of

the unit), the water tank will begin to fill. When the water level in the tank reaches the probe, the heating

element(s) will turn on.

5. Water in the heating tank will require approximately a half hour before reaching operating temperature (factory

setting of 200°F). Where applicable, turn on the Universal Control Module (UCM). When the unit reaches

operating temperature, it will display “READY TO BREW”..

W

ilbur

C

urtis

C

ompany

, i

nC

.

Service Manual – ALPGT Fresh-Trac

Important Safeguards/Conventions

This appliance is designed for commercial use. Any servicing other than cleaning and preventive maintenance

should be performed by an authorized Wilbur Curtis service technician.
• Do NOT immerse the unit in water or any other liquid
• To reduce the risk of fire or electric shock, do NOT open service panels. No user serviceable parts inside.
• Keep hands and other items away from hot surfaces of unit during operation.
• Never clean with scouring powders, bleach or harsh chemicals.

Symbols

WARNINGS – To help avoid personal injury

Important Notes/Cautions – from the factory

Sanitation Requirements

The Curtis Alpha GT is Factory Pre-Set and Ready to Go… Right from the Box.
Following are the Factory Settings for the Alpha Fresh-Trac:

• Brew Temperature = 200°F
• Brew Volume = Set to vessel requirements (60 oz).
System Requirements:

• Water Source 20 – 90 PSI (minimum flow rate of ½ GPM)
• Electrical: See attached schematic for standard model or visit www.wilburcurtis.com for your model.
SETUP STEPS

1. The unit should be level (left to right - front to back), on a secure surface.
2. Connect the water line to the water inlet fitting on the rear of the unit. Water volume flow to the machine

should be consistent. Use tubing sized sufficiently to provide a minimum flow rate of ½ gallon per minute

(1 gallon per minute preferred).

NSF International requires the following water connection:

1. A quick disconnect or additional coiled tubing (at least 2x the depth of the unit) is required so

that the unit can be moved for cleaning.

2. This unit must be installed with adequate backflow protection to comply with applicable federal,

state and local codes.

3. Water pipe connections and fixtures directly connected to a portable water supply shall be

sized, installed and maintained in accordance with federal, state, and local codes.

CAUTION: DO NOT

connect the unit to

hot water supply.

The inlet valve is not rated for

hot water.

CAUTION: Follow

this setup procedure

before attempting

to use this unit. Failure to

follow these instructions can

result in injury and/or void of
warranty.

ISO 9001:2008 REGISTERED

WILBUR CURTIS CO., INC.

6913 West Acco Street

Montebello, CA 90640-5403

For the latest information go to

www.wilburcurtis.com

Tel: 800-421-6150

Fax: 323-837-2410

CAUTION:

Equipment must be

installed to comply

with applicable federal, state,

and local plumbing/electrical

codes.

NOTE: A water filtration system must be used to help maintain trouble-free operation. Air must be

purged from the cartridge prior to connection to equipment. In areas with extremely hard water,

we recommend the use of a Curtis approved water filter. For our full line of filters, please log on to www.

wilburcurtis.com.

Advertising
This manual is related to the following products: