Setup: The compressor is started. If it is the first compressor start, the

compressor reliability enhancement logic (CREL) is executed, running a current

draw test with the additional outputs (if installed) in the following states:

P6-H

High Speed

Compressor Tests

(F d l

d

Component

Normal Logic

(10 seconds)

CREL (3 minutes)

P6-H (For dual speed

units)

SSV

Closed

Open

units)

SMV

20%

100% (for 3 minutes) then 20%

Pass/Fail Criteria: Passes if the change in current draw is within the valid

range.
Setup: The compressor is started. When ambient temperature is greater than

60_F, a two minute CREL is executed. If the ambient temperature is less than

60_F, a three minute CREL is executed. Then a current draw test is done for 10

seconds with the additional outputs (if installed) in the following states:

P6-L

Low Speed

Compressor Tests

(F d l

d

Component

Normal Logic

(10 seconds)

CREL (2

minutes)

CREL (3

minutes)

P6-L (For dual speed

units)

SSV

Closed

Closed

Closed

units)

SMV

20%

20%

100% (for 3

minutes) then 20%

Pass/Fail Criteria: Passes if the change in current draw is within the valid

range.

P6-2 Suction Modulation

Valve (Open)

Setup: The suction modulation valve (SMV) is opened to 100% unless restricted

by current limit function, and the unit is run for two minutes.

Pass/Fail Criteria: The supply and return probe temperature reading difference

is compared to a predetermined value.

P6-3 Quench Valve Test

Setup: The compressor suction temperature is measured with the Quench valve

closed. The Quench valve is energized and the suction temperature drop is

checked.

Pass/Fail Criteria: Passes if suction temperature is within the valid range.

P6-4 Suction Modulation

Valve (Closed)

Setup: The heaters are energized. The suction modulation valve is set to 100%,

and run for one minute. At the end of the one minute run, the supply temperature

is subtracted from the return temperature and the result is saved (reading 1).The

SMV is dropped to 60% and run for one minute. At the end of this one minute

run, the supply temperature is again subtracted from the return temperature and

the result is saved (reading 2).

Pass/Fail Criteria: If the difference between reading 1 & 2 is within a

predetermined range, the test passes. If current limiting occurs, the test passes.

P6-5 Suction Solenoid

Valve

Requirements: The unit must be equipped with a suction solenoid valve (SSV).

Current limiting may close SSV. If this happens, the test will automatically pass.

Setup: The SSV is opened, the suction modulation valve (SMV) is closed. The

quench valve (if configured) will operate according to normal operating rules. If

the return temperature probe is lower than --5.0_C, the test is run for two

minutes, otherwise for one minute. Condenser Pressure Control (CPC) logic is

used for this test if the controller is configured for it.

Pass/Fail Criteria: If the SSV is closed due to current limiting, the test passes. If

supply and return probes are invalid, the test fails. If the test is within a

predetermined range, the test passes. The SSV is closed following this test.