Operations with the kap 140, Takeoff and climb to assigned altitude, Two axis operation 61 – BendixKing KAP 140 User Manual

Page 57: Two axis operation 60, Kap 140 autopilot system, Rev. 1 apr/02

Advertising
background image

KAP 140 AUTOPILOT SYSTEM

Two Axis Operation

61

Rev. 1
Apr/02

3. The autopilot is responding to the heading select

mode with a left bank. The climb rate has been
decreased, using the

DN button, in preparation

for level off.

4. The autopilot has completed the turn and is

now established on a 010° heading. Desired
altitude has been reached, altitude hold (

ALT)

has been engaged and the aircraft maintains
the reference altitude.

Two Axis Operation

60

KAP 140 AUTOPILOT SYSTEM

Rev. 1

Apr/02

1. The aircraft is well off the ground and estab-

lished at a safe climb rate.
The heading bug on the DG or HSI is turned to
the desired heading of 080° (runway heading).
By depressing the

HDG button on the KAP 140,

the autopilot engages into the heading and ver-
tical speed modes and maintains the selected
heading of 080° and current rate of climb.
Note: Press and hold the

AP button for 0.25

seconds to engage the autopilot (applicable
only to software version 03/01 and later).

2. The heading bug on the DG or HSI is turned to

the new desired heading of 010° and the aircraft
begins to respond with an immediate left turn.

N

080

°

010

°

1

2

3

4

1

2

3

4

L

R

2 MIN.

TURN COORDINATOR

NO PITCH

INFORMATION

D.C. ELEC.

GS

GS

N

33

30

W

24

21

S

15

12

E

6

3

ı

AP

G

KAP 140

HDG

NAV

APR

REV

ALT

DN

UP

N

33

30

W

24

21

S

15

12

E

6

3

P

U S H

PUSH

OR

L

R

2 MIN.

TURN COORDINATOR

NO PITCH

INFORMATION

D.C. ELEC.

GS

GS

N

33

30

W

24

21

S

15

12

E

6

3

ı

AP

G

KAP 140

HDG

NAV

APR

REV

ALT

DN

UP

N

33

30

W

24

21

S

15

12

E

6

3

P

U S H

PUSH

OR

L

R

2 MIN.

TURN COORDINATOR

NO PITCH

INFORMATION

D.C. ELEC.

GS

GS

N

3

3

30

W

24

21

S

1

5

12

E

6

3

ı

AP

G

KAP 140

HDG

NAV

APR

REV

ALT

DN

UP

N

33

30

W

24

21

S

15

12

E

6

3

P

U S H

PUSH

OR

L

R

2 MIN.

TURN COORDINATOR

NO PITCH

INFORMATION

D.C. ELEC.

GS

GS

N

33

3

0

W

24

21

S

15

1

2

E

6

3

ı

AP

G

KAP 140

HDG

NAV

APR

REV

ALT

DN

UP

N

33

30

W

24

21

S

15

12

E

6

3

P

U S H

PUSH

OR

OPERATIONS WITH THE KAP 140

Takeoff And Climb To Assigned Altitude

Advertising