13 care and transport, 1 transport, 2 storage – Leica Geosystems Leica mojo3D - User Manual User Manual

Page 246

Advertising
background image

246

Leica mojo3D, Care and Transport

13

Care and Transport

13.1

Transport

Shipping

When transporting the product by rail, air or sea, always use the complete original
Leica Geosystems packaging, transport container or cardboard box, or an equivalent,
in order to protect against shock and vibration.

13.2

Storage

Temperature limits

Respect the temperature limits when storing the equipment, particularly in summer
if the equipment is inside a vehicle. Refer to "15 Technical Data" for information
about temperature limits.

Advertising