7 assembly and installation of mid pto, Assembly and installation of mid pto – Cub Cadet 7532 User Manual
Page 115
Advertising

Transmission
5
74
5.7
Assembly and Installation of
MID PTO
1
Assembly of MID PTO
1. Clean each part sufficiently and assemble.
2. Make sure that snap rings and spring pins are
securely attached.
3. Apply oil to the O-ring and needle bearing for
assembly.
4. Apply lithium grease to the oil seal for assembly.
5. Assemble as shown in the drawing for the spur
gears with specified mounting direction (edgy or
chamfered side).
41T
46T
24T
Grease
Oil
Oil
GZ3W24-040
Advertising
This manual is related to the following products: