Performing pre-deployment – Cisco 12000/10700 V3.1.1 User Manual

Page 113

Advertising
background image

3-59

Cisco 12000/10700 v3.1.1 Router Manager User Guide

OL-4455-01

Chapter 3 Getting Started

Deployment

Performing Pre-deployment

Say that you are expecting the following hardware:

Cisco 12016 chassis and GRP(s)

ATM and POS line cards (with respective interfaces)

To perform both manual pre-deployment and offline configuration, proceed as follows:

Step 1

Manually deploy a site object. See

“Manually Deploying a Generic Site Object” section on page 3-10

for further details.

Step 2

Manually deploy the Cisco 12000 Series Router chassis under a site. See

“Manually Deploying a Cisco

12000/10720 Chassis” section on page 3-20

for further details.

Step 3

Manually deploy GRP(s). See

“Manually Deploying a GRP Card” section on page 3-31

for further

details.

Step 4

Manually deploy the ATM line cards. ATM interfaces are deployed simultaneously. See

“Manually

Deploying Line Cards” section on page 3-38

for further details.

Step 5

Manually deploy the POS line cards. POS interfaces are deployed simultaneously. See

“Manually

Deploying Line Cards” section on page 3-38

for further details.

Now you have pre-deployed and thus created representative objects in Cisco 12000/10720 Router
Manager for your expected hardware, modules, and interfaces. All of these objects will be in the
Decommissioned state.

Advertising