Commissioning a selected module – Cisco 12000/10700 V3.1.1 User Manual

Page 168

Advertising
background image

5-4

Cisco 12000/10700 v3.1.1 Router Manager User Guide

OL-4455-01

Chapter 5 Managing Modules

Module Configuration

Figure 5-1

Configuration Window

Step 2

Choose a Chassis and Module from the list boxes displayed at the left of the window.

Commissioning a Selected Module

Commissioning any card also commissions all the interfaces under the card.

Note

You can select multiple Modules (from the Module object selector list) which allows you to commission
all of the selected modules simultaneously. You can choose multiple modules in a list by holding down
the Shift key and then selecting the first and last module in the list. You can choose multiple individual
modules by holding down the Ctrl key and clicking on the individual modules.

To commission a module, proceed as follows:

Step 1

Open the Configuration window. See

“Viewing the Configuration Window” section on page 5-3

for

further details.

Step 2

Choose a Chassis and Module from the list boxes displayed at the left of the window.

Step 3

Enter additional descriptions into the Description 1 and Description 2 fields in the Additional
Descriptions area (if required). Entering additional descriptions is optional.

Advertising