3execution of measurement, 1 filters, 2 execution of measurement – FRITSCH PULVERISETTE 6 classic line User Manual

Page 15

Advertising
background image

GTM-System

page 12

3

Execution of Measurement

3.1 Filters

• Loosen the two slotted screws (under the transmitter unit).
• Remove plate

• Place filters (after delivery, a filter is already in place)
• Tighten screws of plate

Use the transmitter unit only with a filter.
Generally, change the filter if you us different materials when com-
minuting.
Check the filter after each measurement and change it if necessary.

3.2 Execution of Measurement

1. Test:

• Start-up switches of the transmitter unit.
• condition of the accumulator (full/empty)

• Filter
• Connections on transmitter unit

2. Fill grinding-bowl

(see instruction manual of the mill!)

3. Check the gasket of the grinding bowl

(change if damaged)

4. Screw transmitter unit onto grinding bowl (4 screws)
5. Put grinding bowl in the mill
6. To tighten the grinding bowl please follow the instruc-

tion manual of the mill!

Caution!!
The planetary mill is not to be loaded unbalanced, the load-
ing has always to be effected symmetrically, which means
that the total weight of the GTM II system, the grinding balls
and the sample absolutely needs to be the same than the
counterweight.

Suggestions for the mass balance

volume of

the grinding

bowl „GTM

II“

(ml)

material

weight without

grinding balls

and sample

(gr)

250

stainless

steel

3500

500

stainless

steel

5175

Advertising