Setting up, 2. installing the scale – A&D Weighing FG-150KBM User Manual

Page 8

Advertising
background image

6

Screws

4. SETTING UP

4-1. Attaching a display pod to the base (FG-KAL and FG-KAM)

1. First, remove the 4 screws from the bottom of the display column.

2. Set the display column to the base by pulling the cable

into the base.

? Take care not pinch the cable between the

column and the base.


3. Tighten the 4 screws removed at step 1 to fix

the display column firmly.


4. Tilt the display pod forward by pressing in on

the two round side clamps, and slide off the
cable cover.



5. Pull the bundle of cable out from the top end of

display column, feeding all of slack of the
cable on the base into the display column.

? Take care not scratch the cable.










6. Put the bundle of cable back into the display column.

7. Make sure the cable is fitted to the 2 cable

guides and attach the cable cover.



8. Place the weighing pan on the base.


4-2. Installing the scale

1. Select the place for installing the scale. Refer to “Cautions for installing the scale”

below.

2. Adjust the level of the base, using the spirit level and leveling feet. The FG-KAM has

an extra foot under the display column. Adjust this foot to reach floor after adjusting
the level of the base.

3. Tilt the display pod by pressing in on the two round side clamps.

Cable guide

Cable

Neither slack
Nor tension

Cable cover

Advertising
This manual is related to the following products: