INSTALLATION AND OPERATION MANUAL

Wiring the Manager Heater communications Board – Continued

6. From the wire conduit, remove the two wires (pink and yellow) that are attached to the plug

disconnected from the communications board in step 4.

Figure 1-8: Removing Pink and Yellow Wires from Wire Conduit

7. Cut the connector from the pink and yellow wires and strip the insulation 1/4” (7mm).

Figure 1-9: Removing 2-Wire Connector from Junction PCB

8. Connect the pink wire together with the two black wires present on terminal #16 (See

Figures 1-10 and 1-12).

Figure 1-10: Connecting Pink Wire to Terminal #16

Wire

Conduit

Yellow & Pink

wires cut from

connector

and stripped.