Am series cascade sequencer – AERCO AM Series Boiler Cascade Sequencer Controller User Manual

Page 11

Advertising
background image

AM Series Cascade Sequencer

INSTALLATION AND OPERATION MANUAL

Wiring the Manager Heater Communications Board – Continued

9. Connect the yellow wire together with the two red wires present on terminal #17 (See

Figures 1-11 and 1-12).

Figure 1-11: Connecting Yellow Wire to Terminal #17

Figure 1-12: Terminal Wiring Diagram for Managing Heater

NOTE

Other wiring is not shown for diagram clarity.

Connect YELLOW Wire

To Terminal #17

Connect PINK Wire

To Terminal #16

Existing BLACK Wires

On Terminal #16

Existing RED Wires

On Terminal #17

OMM-0101_0A

AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913

Page 11 of 26

GF-146-CS

Ph.: 800-526-0288

PRI - 11/25/14

Advertising