AM Series Cascade Sequencer

INSTALLATION AND OPERATION MANUAL

Preparing the Cascade Sequencer for Use - Continued

3. Feed both wires through the rear panel conduit opening and snap rear panel onto rear of

cascade Sequencer (Figure 1-17).

Figure 1-17: Replacing Cascade Sequencer Rear Panel after Wiring

1.5 Setting the Logic Address for Each Heater

Program the logic address of each heater using the Cascade Sequencer as described below.

Setting the Logic Address for Each Heater

NOTE

Refer to Section 1.31 for location of the electrical junction

enclosure and wiring terminals mentioned below. See Section 2

for how to operate the unit and access menus and parameters.

1. Ensure power is turned OFF to the Managing heater #1.
2. Connect the two wires from the Cascade Sequencer to terminals 16 and 17 of the Managing

heater # as shown in Figure 1-18.



Figure 1-18: Wiring Cascade Sequencer to Terminals 16 and 17

NOTE

The wiring diagram shown in Figure 1-18 applies to all heaters in

cascade, as each will be programmed with a unique logic address

using the Cascade Sequencer. Other wiring is not shown for

clarity.

OMM-0101_0A