Am series cascade sequencer – AERCO AM Series Boiler Cascade Sequencer Controller User Manual

Page 13

Advertising
background image

AM Series Cascade Sequencer

INSTALLATION AND OPERATION MANUAL

1.3.3 Manager Heater Preparation - S4 Switch on the Burner #1 Board

The S4 switch on the Burner #1 (Master) board must be set to OFF as described below.

Setting Manager Heater Burner #1 (Master) S4 Switch

1. Gain access to the Burner #1 (Master) Board and S4 switch by removing the front cover of

managing unit. Note the location of the Burner #1 (Master) Board in Figure 1-14 (it is cyan

colored in the image).

NOTE

The model shown in Figure 1-14 is the AM1000. The AM750 does

not feature Burner Board #2. In the AM399 and AM500 models,

the #1 (Master) Burner board is the one on the BOTTOM.

2. Locate S4 switch opening on upper right of #1 burner board (Figure 1-14) and use a small

flathead screwdriver set to switch to OFF (UP) per Figure 1-14 detail.

Figure 1-14: Locating Burner #1 (Master) Board and Setting S4 Switch

Burner #1 (Master) Board

ON

OFF

Burner #2 Board (Not Present in

AM750 Units)

STEP 2: Set S4 Switch to OFF (UP)

(Board Cover removed for clarity)

S4

Switch

Burner #3 Board
Burner #4 Board

OMM-0101_0A

AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913

Page 13 of 26

GF-146-CS

Ph.: 800-526-0288

PRI - 11/25/14

Advertising